As part of continued development in Cleveland, Sherwin Williams constructed a new 600,000sf research and development facility in Brecksville which opened in 2025.

Precision ProFloor, with our extensive team of professional concrete polishers, met the challenges of an accelerated time frame to complete the installation 70,000sf of a 400 grit high gloss polished concrete floor.

In addition to this work, Precision ProFloor installed Tru PC polishable topping system in select areas, grind and sealed mechanical rooms and stairways, and installed polyurea caulking throughout. The polished concrete was installed in the hallway, cafeteria, and dining areas.

Range:

>$900,000

Location:

Brecksville, OH

Summary:

Precision ProFloor, with our extensive team of professional concrete polishers, met the challenges of an accelerated time frame to complete the installation 70,000sf of a 400 grit high gloss polished concrete floor

Services Performed:

The Sherwin-Williams Company (“Sherwin-Williams”) owns all right title and interest in and to the project progress videos and photos located on this page.
© 2025 Precision Environmental. Some rights reserved. Terms & Conditions.